TSK Praha
A new 2.3 kilometre road links Lochkov and Slivenec to take through traffic out of the villages
The Prague roads authority TSK has taken over a new 2,286 metre local road between Lochkov and Slivenec. It was built in 300 days by rebuilding a site road left over from the construction of the Prague Ring and links K Cikánce and K Lahovské streets; the contractor was SWIETELSKY stavební. It is meant to move through traffic away from the residential parts of Lochkov, Velká Chuchle, Slivenec and Radotín and speed up access to the motorways and the ring road.




